Ahoy!
On Tuesday April
17, '07 at 1400 the Footing was poured.
On
friday April 20, '07 the Footing forms were removed, the Bottom Plate
installed, the trench back-filled, and the site swept, and cleared. It was a
pleasure to behold a First Class job...and watertight too...which was
expected.
Yes...the proof
came the next day in the form of forecast showers during the night. The
lightening flashed, the thunder boomed, the wind howled, and the "sea"
boiled.
A sunny Sunday
morning dawned revealing that the Nice Guys Corp Footing contained the
tempest.
However, we feared
not, as we prepared for such an event...we rented an ark from Good Guys Ark
Rentals. A stroke of genius on our part.
Avast! We did
however read in the Fine Print of the Ark Lease that "Forty-Day, and
Forty-Nighters" weren't covered.
Drat!
On Tuesday April 24
'07 at 1300 the Inspector came and signed off on the Footing Plate. He seemed
pleased, and left smiling.
If'n anyone is
wondering how the enclosure was de-watered...there was about fifty
gallons...it was shoveled out.
Forget about using
a ShopVac unless disassembling, dumping, and re-assembling it fifty
times sounds like fun, it isn't. I knew I should have saved some of those pumps
I had on the boats I've owned. You can't win 'em all. Ha
ha.
The weather since
continues sunny, and pleasant.
A week has past
since
We now await the
Demo Guys to remove the overhangs.
Ouch!
|